Bramha The Collection
Bramha The Collection is a premium new-launch luxury residential development by BramhaCorp, set in one of the city's fast-emerging growth corridors. Laid out over 6 acres, the project brings together contemporary high-rise living with everyday comfort and convenience. Its residential plan comprises 4 towers of 28 floors each, accommodating 1,114 thoughtfully planned 2 BHK, 3 BHK, and 4 BHK apartments. Unit sizes span 798 sq ft to 1,854 sq ft, with prices starting at Rs 1.24 Crore* onwards.
Get Brochure & Cost Sheet
Instant pricing, floor plans & brochure from an authorized channel partner.
Chat on WhatsApp100% privacy. No spam. Authorized channel partner.
Project Overview
Bramha The Collection is a premium luxury new launch residential project in one of the city's growing areas, developed by BramhaCorp . The project is spread across 6 acres; it offers modern high-rise living designed for comfort and convenience. The residential layout includes 4 multi-storey towers rising to 28 Floors, hosting 1114 units of 2 BHK, 3 BHK, and 4 BHK apartments. The floor sizes of the apartments range from 798 sq ft to 1854 sq ft. The price starts from Rs 1.24 Crore* onwards.
The project is close to key transport options and the main hubs of the area. The nearest Bus Stop is Match Well Company Bus Stop, which is just 300 meters away and takes about 2 minutes to reach. The nearest Metro Station is Ramwadi Metro Station, located 2 km away, while Hadapsar Railway Station is 6.3 km from the project. The Pune International Airport is also easy to reach, located just 4.3 km away with a drive time of around 14 minutes.
| Project Type | Luxury Apartments in Pune |
|---|---|
| Total Area | 6 acres |
| Project Status | New Launch |
| Unit Types | 2, 3, 3.5 & 4.5 BHK |
| Category | Luxury |
| Size Range | 798 sq ft - 1854 sq ft |
| Price Range | Rs 1.24 CR onwards |
| Unit Floors | 3B+4+28 floors |
| RERA | P52100022019 |
Unit Details:
Bramha The Collection, a top notch apartment project, features thoughtfully designed modern residences. This property features premium amenities and well-planned spaces for comfort. Every home is built to be bright, airy, and to make the most of every square foot. Spread across 6 acres, the project includes Vaastu-compliant apartment towers with 3B+4+28 floors.
Below are the available apartment types,
- 2 BHK: 798–820 sq. ft.
- 3 BHK: 1140 sq. ft.
- 3.5 BHK: 1425–1609 sq. ft.
- 4.5 BHK: 1667–1854 sq. ft.
Apartments at Bramha The Collection start at Rs 1.24 Crores for a 2 BHK, which is a really good deal for Pune.
USPs (Unique Selling Points) and Lifestyle Advantages
Bramha The Collection mixes modern design with the daily needs of Pune's tech workers.
- Premium Township Urbanism: Unlike normal tall buildings, this project is built to feel like a big, modern neighborhood. It has nice main gates, water fountains, and clean walking paths that make your daily life feel special and high quality.
- The Green Ratio: The project saves a big part of its 6-acre land for open spaces, green gardens, and beautiful outdoor areas. Because the layout has plenty of room, homes are not packed close together. Your home will face green nature instead of your neighbor's balcony.
- Zero-Dead-Space Engineering: Every 2, 3, 3.5, and 4.5 BHK home is planned carefully to use space well. The design makes sure that every foot of room you buy is useful for your family, with no wasted corners.
- Strategic "Walkable" Connectivity: Placed in a great spot, residents can reach the Match Well Company Bus Stop in just 2 minutes and the Ramwadi Metro Station in a short drive. For workers, major commercial and IT hubs are close by, helping you skip the worst city traffic.
- Future-Ready Smart Infrastructure: Every home comes with helpful smart technology. With strong safety systems and modern door security, each home uses tech to keep your family safe and comfortable.
- Integrated Shopping Convenience: You do not have to travel far for your everyday needs. Popular shops, cafes, grocery stores, cinema halls, and daily services are close by right outside your door.
- Wellness-First Amenities: Far more than a basic gym, the large club area has a swimming pool, fun play spaces for children, and calm walking tracks. These are built to help you rest and stay healthy after a busy work day.
Bramha The Collection Key Dates:
The Bramha The Collection Launch Date is 2025.
- Pre-Launch Date: 2025
- Launch Date: 2025
- Estimated Completion Time: 4 Years
- Completion Date: December 2029
- Possession Date: December 31, 2029
Reviews, Ratings and Brochure:
Bramha The Collection Reviews are positive, with an excellent rating of 4.5 out of 5. High ratings for this project come from its fantastic, well-connected location and its affordable price. Apartments at Bramha The Collection are a great option to reside in with the latest designs in Pune's vibrant locality.
The Bramha The Collection Brochure provides a detailed outlook and includes all the details about the project's location, floor plans, building designs, overall property layout, and the full list of features and facilities. The Bramha The Collection Brochure PDF can be downloaded from this website for free.
RERA:
Bramha The Collection is now fully approved. It is officially registered with Maharashtra RERA (P52100022019) and cleared by local city authorities (PMC and PMRDA). All paperwork is complete, giving the project total legal permission to move forward.
EOI Payment and Bank Details:
Bramha The Collection's Expression of Interest (EOI) / Pre-Launch Booking process is open. The Bramha EOI Process can be done online by submitting an application. Simply fill in your details and choose your preferred unit, and submit a post-dated cheque (PDC) or online token payment in favor of BramhaCorp.
Launch Token Amounts for different options:
Token Amount: ₹5,00,000* (Applicable across all configurations)
Token holders get to pick their home first, get top priority for booking, and enjoy special early bird prices.
Payment Plan Structure:
Bramha The Collection Payment Plan is a flexible scheme with 10:10:80 Payment slots
- 10%: On Booking
- 10%: On Agreement / Allotment
- 80%: Construction-Linked Installments and During Possession
About BramhaCorp
BramhaCorp is a real estate company in India that started in 1982. With over 40 years of experience, they have built many well-known homes, offices, and hotels for thousands of happy families in Pune.
The company is financially strong and makes good money every year. Right now, BramhaCorp is building new luxury homes, hotels, and office spaces across the city. Because they are honest, fair, and keep growing, many modern home buyers trust and choose them.
Apartment Types and Price
The Apartment Types offered at Bramha The Collection include homes ranging from 2 to 4 BHK. Bramha The Collection prices start at Rs 1.26 Cr for 2 BHKs and range up to 4 BHKs.
| Unit Configuration | Super Built Up Area | Price |
|---|---|---|
| 798 sq ft –820 sq. ft. | ₹ 1.24 Cr onwards | |
| 1140 sq. ft. | ₹ 1.88 Cr onwards | |
| 1425 sq ft –1609 sq. ft. | ₹ 2.19 Cr onwards | |
| 1667 sq ft –1854 sq. ft. | ₹ 2. 52 Cr onwards |
Master Plan
Bramha The Collection Master Plan is designed on 6 acres with 4 high towers each having 3B+G+28 upper floors.
Floor Plan
Bramha The Collection Floor Plan comprises floor layouts of 2, 3, 3.5 & 4.5 BHK apartments. The floor sizes start from 798 sq ft - 1854 sq ft. The price at pre launch ranges between Rs 1.24 CR for 2 BHK apartments.
EMI Calculator
Planning your money for a premium home at Bramha The Collection in New Kalyani Nagar is simple when you figure out your costs early. To see exactly how much you will pay each month, it is best to use a trusted online home loan EMI calculator. You just need to type in the loan amount you want, the current yearly bank interest rate, and how many years you want to take to pay it back (up to 30 years). The EMI calculator will instantly show your monthly payment plan.
Estimate only. Actual EMI depends on your lender's terms.
Location
Bramha The Collection Address is New Kalyani Nagar, North Pune, Maharashtra - 411014. This location is a prime residential zone due to its close proximity to major IT parks and commercial hubs like EON IT Park, World Trade Center, and Viman Nagar business centers.
Bramha The Collection Address
- Area: New Kalyani Nagar
- City: North Pune
- State: Maharashtra
- Country: India
- Zip Code: 411014
- Landmark: Opposite of Shivaji Maharaj Garden
- Latitude: 18.549188
- Longitude: 73.916211
Details on entry and positioning of Bramha The Collection:
Bramha The Collection has its main entrance in the heart of New Kalyani Nagar. The road leading to the entrance of the project is wide and spacious. The project sits in a beautiful, quiet area close to famous landmarks like Viman Nagar, EON IT Park, and Business Bay.
The Connectivity Edge - Apartments Near Ramwadi Metro Station:
Residents at Bramha The Collection can enjoy an easy, stress-free daily travel. Choosing a home near the Ramwadi Metro Station helps owners avoid North Pune's heavy rush-hour traffic. Located just a short 2 km drive from the project, the Metro Line links you directly to the main business areas across Pune. For tech workers traveling to local office parks and IT hubs, this close distance makes daily travel smooth and quick, giving you more free time at home.
The Advantage of New Kalyani Nagar Connectivity:
Location is very important when buying a home. The excellent connection to major city roads places Bramha The Collection right in the middle of North Pune's fastest-growing area. These wide, well-built roads provide a smooth and fast drive to both the IT hubs and the busy markets of Viman Nagar, Koregaon Park, and Kalyani Nagar. The project offers quick access to major bypass roads. Because of this, residents can live in a peaceful, uncrowded neighborhood while still being close to top schools, hospitals, and malls.
Location Benefits of living in Bramha The Collection:
Since Bramha The Collection is in a prime neighborhood, it offers these great location advantages:
- Offers quick access to Nagar Road, Koregaon Park Annexe, and major highways
- Excellent location very close to the Ramwadi Metro Station and Match Well Company Bus Stop
- Easy travel to workplace hubs in Kalyani Nagar, Viman Nagar, Kharadi, and Magarpatta
- Near famous schools and educational institutions in North and East Pune
- Close to top hospitals and healthcare centers
- Near popular shopping malls and weekend entertainment spots in North Pune like Phoenix Marketcity
- Simple drive to Pune International Airport using main connecting roads
Key Distances:
Bramha The Collection is a premium new project by BramhaCorp in New Kalyani Nagar that connects you easily to trains, buses, the airport, metro, and hospitals.
- Pune International Airport: The project is about 4.3 km away from the Pune International Airport. Residents can drive via main roads to reach the airport in 14 minutes.
- Ramwadi Metro Station: The Ramwadi Metro Station is the closest metro stop at just 2 km away. You can reach it quickly in a short drive.
- Match Well Company Bus Stop: The bus stop is just 300 meters away, taking about 2 minutes to reach.
- Hadapsar Railway Station: The railway station is located 6.3 km away from the project.
Amenities
Bramha The Collection amenities more than 35+ different spaces for fitness, sports, fun, and relaxation. These features are placed across the 80% open green areas and play zones.
- Gymnasium
- Swimming Pool
- Yoga Pavilion
- Video Door Phone
- Kids Activity Zone
- Mini Theater
- Tennis Court
- Indoor Games Room
- Club House
- Dance/Music
- 24/7 CCTV Monitoring
- Jogging Track
About
Bramha The Collection is a premium high-rise gated community project in New Kalyani Nagar set to be launched in 2026. The Bramha The Collection pre-launch price starts from Rs 1.26 crore onwards. The project is designed with modern amenities that are desired by modern buyers.
What does Bramha The Collection mean?
The name 'The Collection' represents curated luxury, fine living, and premium quality. The theme of Bramha The Collection is to create a grand, well-connected township that offers luxury and a modern lifestyle, making it ideal for premium residential developments in North Pune.
About Bramha The Collection Towers and Blocks:
Bramha The Collection comprises a total of 2 Blocks hosting 4 high-rise towers, spread across 6 acres with 3 Basements + Ground floor + 28 Floors (3B+G+28).
| Block Number | Total No of Towers | Tower Name |
|---|---|---|
| Block 1 | 2 Towers | T-01, T-02 |
| Block 2 | 2 Towers | T-03, T-04 |
Unique State-of-the-art Features at Bramha The Collection
Bramha The Collection offers the best resort-style facilities, and here are the details on what you get:
- Built with zero-dead-space efficiency (very little wasted space)
- Built with large open spaces filled with lots of green gardens
- Has fun features for children like a Kids Play Area, Board Games, and Mini Play Area
- Comes with fitness features like a Gym, Workout area, and Yoga space
- Comes with an indoor games room which includes Table Games, Pool Table, and Game Zone
- Comes with rooftop features like a Rooftop Party Lawn, BBQ Corner, Stargazing Deck, and Pergola Seaters (shaded seats)
What makes Bramha The Collection a good choice to invest your money in New Kalyani Nagar:
Bramha The Collection is an apartment from BramhaCorp, a highly trusted and well-known builder in the property market. There are great hospitals, schools, colleges, and shopping malls close to the area, which makes it a perfect place for families to live. This location also promises strong property value growth along with good monthly rental income. The excellent location of the project near major IT hubs and commercial centers like Viman Nagar and Kharadi makes it the best choice for tech professionals who work in IT companies in North Pune.
Apartments
Apartments are modern homes inside a tall building that offer private living spaces and shared areas for fun and fitness. These housing units are very convenient for city families today. Because many people want luxury homes with modern features like a spa, gym, and pool, top builders are now launching big apartment communities in major cities.
The new Bramha The Collection project is a premium apartment complex in New Kalyani Nagar, North Pune built for high-end living. It offers homes ranging in size from 798 sq ft to 1854 sq ft. The buyer can choose from 2 BHK, 3 BHK, 3.5 BHK, and 4.5 BHK options. All the homes are built with excellent finishes, high ceilings, and are designed according to Vaastu.
Bramha The Collection apartment sizes for sale:
The sizes at Bramha The Collection range from 2 BHK to 4.5 BHK units to fit families of all sizes. There are 4 main options:
- The size of a 2 BHK apartment (2 comfortable bedrooms, hall, and kitchen) is 798 to 820 sq. ft. This is a great choice for small families and couples.
- The 3 BHK apartments (3 comfortable bedrooms, hall, and kitchen) are 1,140 sq. ft. These larger homes are the best option for growing families or anyone who needs extra living space.
- The 3.5 BHK apartments (3 bedrooms, study room, hall, and kitchen) range from 1,425 to 1,609 sq. ft. These spaces are ideal for those who want a separate home office or study.
- The 4.5 BHK apartments (4 bedrooms, study room, hall, and kitchen) range from 1,667 to 1,854 sq. ft. These extra-large units are perfect for big families or people who want a luxurious lifestyle.
Model Apartments at Bramha The Collection:
Sample model apartments will be ready to visit at the project site in different sizes. These sample units will be open for you to see when the project launches in late 2026. Buyers can walk through these model homes to get a clear look at the room sizes and interior finishes.
Advantages of Investing in Bramha The Collection Apartments
Resort-Style Facilities
The project offers top-quality features, including a spa, cafe, rooftop garden, kids' play zone, clubhouse, walking path, and a swimming pool. These features give everyone a great way to relax.
Safe Neighborhood
The property is packed with safety features like CCTV cameras, intercom phones, entry gates, video door phones, and 24/7 guards to keep your family safe in the big city.
Many Size Choices
The project offers flats in 4 different configurations (2 BHK, 3 BHK, 3.5 BHK, and 4.5 BHK) starting from 798 sq ft up to 1854 sq ft. This makes it easy for buyers to find a home that fits their exact size needs.
Fair Pricing
The price is very reasonable, starting at Rs 1.24 Crore onwards, which is lower than many other houses in this area.
About New Kalyani Nagar
New Kalyani Nagar is a popular area to live along the main road that links Kalyani Nagar to Koregaon Park and Viman Nagar in North Pune. The area is becoming a top choice for buying homes because it has great roads and is quickly building new schools, hospitals, and shops. Located just a few minutes from major commercial centers, this area is very close to top IT companies like Barclays, Credit Suisse, Wipro, Zensar, and Infosys.
The new project has great pre-launch apartments. These are perfect homes for buyers who work in the nearby IT companies of North Pune. New Kalyani Nagar offers luxury apartments for sale in North Pune with top-quality facilities. The project mixes green living with being close to city life, making it a great choice for modern families. Because it is close to IT hubs and has good pricing, this area is expected to grow well in value over time.
5 Best Projects by BramhaCorp in North Pune
- BramhaCorp F-Residences: Luxury smart apartments in New Kalyani Nagar near major commercial hubs.
- BramhaCorp Smart: Modern high-rise residences designed for convenience near prominent business districts.
- BramhaCorp Water's Edge: Premium riverside apartments offering serene living near prime neighbourhoods.
- BramhaCorp Augusta: Upscale high-rise residences with modern lifestyle features in prime locations.
- BramhaCorp Business Park: State-of-the-art commercial and office spaces located in key business zones.
Top 3 Benefits of Buying an Apartment in New Kalyani Nagar
- Near IT Hubs: Many major office areas like Business Bay, Commerzone, EON Free Zone, World Trade Center Pune, and Cybercity are close by, which cuts down your daily travel time.
- Great Connections: The area connects easily to major roads like Nagar Road, Koregaon Park Annexe, and Kalyani Nagar Main Road. The Ramwadi Metro line makes travelling even easier.
- Good Prices: Home prices in New Kalyani Nagar are reasonable and offer high value compared to neighbouring prime areas like Koregaon Park and Kalyani Nagar. This makes it perfect for first-time buyers who want good financial returns in the future.
Pune
Pune is becoming a top choice for people who want to buy a home, thanks to its booming IT hubs, educational institutions, and rapidly expanding infrastructure. Property prices are appreciating steadily, offering strong returns on investment across both central prime areas and surrounding growth corridors. Citywide developments like the expanding Metro network, new ring roads, and commercial hubs have a big, positive effect on residential values.
Top BramhaCorp Projects in Pune
- BramhaCorp F-Residences – Superlative luxury apartments in New Kalyani Nagar, Pune
- BramhaCorp Sun Valley – Premium high-rise residences in Bavdhan, Pune
- BramhaCorp Hues Of Sky – High-end luxury residential spaces in Camp, Central Pune
- BramhaCorp August Towers – Modern, well-connected apartments in Kalyani Nagar, Pune
- BramhaCorp Water Bay – Contemporary waterfront residences in New Kalyani Nagar, Pune
Bramha The Collection New Kalyani Nagar is the most awaited luxury housing launch in the North area of Pune. The excellent facilities, along with the high-quality building work, give residents much more than just a place to live. This great location not only makes the project attractive but also ensures that the property keeps its high value over time.
Approvals & Legal Status
Land Approval
Bramha The Collection has received official land permissions from the PMC and PMRDA.
Legal Status of the Property
Bramha The Collection has clear legal papers with no ownership problems now or in the future. The project has received its official RERA approval (RERA No: P52100022019). This official approval proves that the property is completely safe for your investment.
Bank Approvals
Bramha The Collection is approved by top banks like SBI, HDFC, Kotak Mahindra, ICICI, and Axis Bank. This makes it easy for you to get a safe home loan. It also shows that these major banks have checked the project papers and trust it completely.
Legal Documentation
The important legal papers for Bramha The Collection are:
- Sale Deed
- Agreement to Sell
- 7/12 Extract (Land Records)
- Completion Certificate (CC)
- Encumbrance Certificate
- Building Plan Approval
- Possession Certificate
- Occupancy Certificate (OC)
- Parent Deed / Mother Deed
- RERA Registration Certificate
Land Survey
The land survey for Bramha The Collection is completed and approved by the PMC and PMRDA. The land matches all city building rules and meets all government laws for construction.
Home Loan Approval
You can get a quick home loan from top banks like SBI, Axis Bank, ICICI, Kotak Mahindra, and HDFC to buy a flat here. They have already checked the project, which makes your payment options easy and safe.
Taxes & Standards
Buying an apartment at Bramha The Collection includes these standard government charges:
- Property Tax: A yearly tax paid to the PMC based on your home size and location.
- GST: 5% for regular luxury homes, and 1% for smaller budget homes.
- Stamp Duty Charges: 6% to 7% of the total property value (according to Maharashtra state rules).
- Registration Charges: 1% of the total agreement value (up to maximum government limits), paid when registering the home under your name with the government.
News Bulletin: Bramha The Collection's Latest News:
The most eagerly awaited project of 2026, Bramha The Collection, has officially received its RERA approval (RERA No: P52100022019). The project is getting ready for its big official launch later this year. The ground is now fully cleared, and workers will build the boundary wall soon. After that, construction on the model apartments will begin.
Know your project:
- After successfully building many tall apartment projects in Pune, BramhaCorp is now ready with its new luxury township, Bramha The Collection.
- This new project offers high-end flats in large sizes: 2, 3, 3.5, and 4.5 BHK.
- Prices for these reasonably priced apartments start from Rs 1.24 Cr.
BramhaCorp
BramhaCorp is a leading Indian home builder, started 40 years ago by Bramhadutt Agrawal. Their main office is in Pune, and they are well-known for building houses, office spaces, and hotels across major areas of the city. They have completed over 4 decades of excellence and delivered millions of square feet of space for different types of properties.
Key points behind BramhaCorp's success
- Never compromise on building quality
- Known for finishing work on time
- Bring the newest designs to the property market
- Focus heavily on what buyers need
- Keep business dealings completely honest and clear
BramhaCorp Upcoming Projects in Pune 2026
Upcoming projects are the new properties that have just entered the market. You can book them now, and buyers can get special early offers. In 2026, BramhaCorp launched new projects in Pune, which include:

Bramha The Collection

BramhaCorp Sun Valley

BramhaCorp Hues Of Sky
BramhaCorp Ongoing Projects in Pune
Ongoing projects are properties that are currently being built. Once the work is fully finished, buyers can take the keys and move into their new houses. BramhaCorp has many ongoing projects in Pune, such as:

BramhaCorp August Towers

BramhaCorp F-Residences
BramhaCorp Completed Projects in Pune
Completed projects are houses where all building work is finished and the official completion certificate is ready. These homes are ready for you to move into at any time. BramhaCorp has finished many projects in Pune, including:

Bramha Sun City

BramhaCorp Water Bay
FAQs
1. What is Bramha The Collection?
Bramha The Collection is a new premium residential project in New Kalyani Nagar, North Pune. It is developed by BramhaCorp and offers modern, high-rise luxury apartments.
2. Who is the builder of Bramha The Collection?
The project is built by BramhaCorp, a trusted Indian real estate company started in 1982 with over 40 years of experience.
3. What is the total land area of Bramha The Collection?
The project is spread across 6 acres of land with 80% open green space.
4. What is the RERA registration number for this project?
The official RERA approval number for Bramha The Collection is P52100022019.
5. When is the completion and possession date?
The estimated completion and possession date for Bramha The Collection is December 31, 2029.
6. What types of apartments are available in Bramha The Collection?
The project offers 4 main apartment types: 2 BHK, 3 BHK, 3.5 BHK, and 4.5 BHK homes.
7. What is the starting price for an apartment?
Prices for a 2 BHK apartment start at Rs 1.24 Crore onwards.
8. What are the size ranges for the apartments?
2 BHK: 798 to 820 sq. ft.
3 BHK: 1,140 sq. ft.
3.5 BHK: 1,425 to 1,609 sq. ft.
4.5 BHK: 1,667 to 1,854 sq. ft.
9. Are the apartments built according to Vaastu?
Yes, all apartments at Bramha The Collection are designed according to Vaastu principles and zero-dead-space engineering.
10. Are model sample apartments available to see?
Yes, sample model apartments will be ready to visit at the project site so buyers can check room sizes and interior designs.
11. How many towers and floors does the project have?
The project has 2 Blocks hosting 4 tall towers with 3 Basements + Ground + 28 Floors (3B+G+28).
12. How many total housing units are there in Bramha The Collection?
The project offers a total of 1,114 residential units.
13. Where is Bramha The Collection located?
The project is located in New Kalyani Nagar, North Pune, Maharashtra - 411014, opposite Shivaji Maharaj Garden.
14. How far is the Pune International Airport from the project?
Pune International Airport is about 4.3 km away, which takes around 14 minutes by car.
15. What is the nearest metro station to the project?
The Ramwadi Metro Station is the closest metro stop, located just 2 km away.
16. What is the nearest bus stop?
The Match Well Company Bus Stop is just 300 meters away, taking only 2 minutes to reach on foot.
17. Which IT hubs and business centers are nearby?
The project is close to major business centers like EON IT Park, World Trade Center, Business Bay, and Commerzone.
18. What amenities are provided in Bramha The Collection?
The project offers over 35+ facilities, including a Gymnasium, Swimming Pool, Yoga Pavilion, Kids Activity Zone, Tennis Court, Indoor Games Room, Clubhouse, and Rooftop Party Lawn.
19. Is the community safe for families?
Yes, the project features 24/7 CCTV monitoring, video door phones, entry security gates, and trained security guards.
20. What is the Token / EOI amount for booking?
The pre-launch booking / EOI token amount is ₹5,00,000 for all unit configurations.
21. What is the Payment Plan structure?
The project offers a flexible 10:10:80 payment plan:
10%: On Booking
10%: On Agreement / Allotment
80%: Construction-Linked Installments and During Possession
22. Are home loans available from banks?
Yes, the project is approved by major banks including SBI, HDFC, ICICI, Axis Bank, and Kotak Mahindra Bank.
23. Does Bramha The Collection have land and legal approvals?
Yes, the project has received clear legal permissions from PMC, PMRDA, and Maharashtra RERA.
24. What standard government charges apply when buying a home here?
Standard charges include Stamp Duty (6% to 7%), Registration Charges (1%), GST (5% for regular luxury homes), and yearly PMC Property Tax.
25. What are some other key projects by BramhaCorp in Pune?
Other famous projects by BramhaCorp include BramhaCorp F-Residences, BramhaCorp Sun Valley, BramhaCorp August Towers, and Bramha Sun City.
Blog

Location

Floor Plans

Master Plan

Amenities

Price

Specifications

Gallery

Contact

Address

Airport Connectivity

Directions

New Kalyani Nagar

Construction Status

FAQs

RERA

Bramha Corp

Pune

North Pune

New Launch

Possession Date

Pre Launch

Launch Date

Launch Price

Price List

Pre Launch Price

Payment Plan

Maintenance Charge

Model Apartment

Metro

Video

Map

Offers

Cost Sheet

Investment

Project Status

Completion Date

Inauguration

Connectivity

Rent

Brochure

Resale

Reviews

Awards

Advantages

Distance

Near By Landmarks

Office

Photos

Latest News

Latest Photos

Hospitals Nearby

IT Hubs Nearby

Malls Nearby

Schools Nearby

Best Apartment In New Kalyani Nagar

Best Apartment In North Pune

New Launch Apartment In New Kalyani Nagar

New Launch Apartment In North Pune

Pre Launch Apartment In North Pune

Best Apartment On Nagar Road

Best Gated Community On Nagar Road

Luxury Apartment In New Kalyani Nagar

New Launch Apartment On Nagar Road

Pre Launch Apartment In New Kalyani Nagar

Biggest Apartment On Nagar Road

Luxury Apartment On Nagar Road

Pre Launch Apartment On Nagar Road

New Launch Apartment In North Pune 2026

New Launch Apartment In Pune 2026

New Launch Apartment In Viman Nagar 2026

New Launch Apartment On Nagar Road 2026

Pre Launch Apartment In Pune 2026

Pre Launch Apartment In North Pune 2026

Pre Launch Apartment In New Kalyani Nagar 2026

